The Oregon Electrical Permit Application Linn form is a crucial document required for obtaining electrical permits in Linn County. This form helps ensure that all electrical installations comply with local regulations and safety standards. By completing this application, property owners and contractors can initiate the permitting process for their electrical work.
The Oregon Electrical Permit Application Linn form serves as a critical tool for individuals and contractors looking to undertake electrical installations within Linn County. This comprehensive document, issued by the Planning & Building Department, outlines essential information necessary for obtaining an electrical permit. It requires applicants to provide details about the location of the installation, including township, range, section, and tax lot numbers. Additionally, the form differentiates between contractor installations and owner installations, ensuring that all parties involved are correctly identified. The application emphasizes the importance of completing all sections, from providing the property owner's information to detailing the scope of work to be performed. A clear fee schedule is included, listing costs associated with various types of electrical work, such as residential installations and service alterations. Notably, the form also highlights the non-transferable and non-refundable nature of permits, which expire if work is not initiated within 180 days. This structured approach not only facilitates compliance with local regulations but also promotes safety and accountability in electrical work throughout the county.
LINN COUNTY ELECTRICAL PERMIT APPLICATION
Planning & Building Department
PO Box 100, Albany, OR 97321
Phone: 541-967-3816
Fax: 541-926-2060 www.co.linn.or.us
PLEASE COMPLETE ALL SECTIONS, 1 THROUGH 4.
1. LOCATION OF INSTALLATION
Twp _______ Rg ________ Section _________ Tax Lot ________
Building Permit
Property Owner
Address
CityCounty
Directions
Job Description
Work Performed by
PERMITS ARE NON-TRANSFERABLE AND NON-REFUNDABLE AND EXPIRE IF WORK IS NOT STARTED WITHIN 180 DAYS OF ISSUANCE OR IF WORK IS SUSPENDED FOR 180 DAYS.
2.(A) CONTRACTOR INSTALLATION ONLY
Electrical Contractor
City
State OR
Zip Code
Phone:
Job No.
Contractor Lic.
Expires
Contractor's Board No.
SUPRERVISING ELECT'N:
License No.
2. (B) FOR OWNER INSTALLATIONS
Owners Name
State
Phone Number
THIS INSTALLATION IS BEING MADE ON PROPERTY I OWN WHICH IS NOT INTENDED FOR SALE, LEASE OR RENT.
PERMIT NO. E
Issued by
Date Issued
3. COMPLETE FEE SCHEDULE BELOW
A. Residential per unit
Inspections
Service included:
Items Cost (ea.)
Sum
allowed
1000 sq. ft. or less
113.00
4
Each additional 500 sq. ft./portion
20.00
Limited Energy-Residential Only
48.00
1
B. Services/Feeders Installation, Alteration or Relocation
200 amps or less
85.00
2
201 amps to 400 amps
100.00
401 amps to 600 amps
167.00
601 amps to 1000 amps
218.00
Over 1000 amps or volts
500.00
Reconnect only
68.00
C. Temporary Services/Feeders Installation, Alteration or Relocation
92.00
Over 401 amps to 600 amps
134.00
Over 600 amps or 1000 volts see "B" above
D. Branch Circuits - New, Alteration or Extension per panel
a)The fee for branch circuits with purchase of service or feeder
Each branch circuit
5.00
b)The fee for branch circuits without purchase of service or feeder
First branch circuit
58.00
Each additional circuit
E. Miscellaneous (service or Feeder Not Included)
Each pump or irrigation circle
Each sign or outline lighting
Commercial limited energy panel
F. Each additional inspection over the
allowable in any of the above
Owner's signature
DO NOT COVER ANY WORK UNTIL APPROVAL IS GRANTED.
OFFICE USE ONLY
4. Fees
A. Enter total of above fees
12% surcharge (.12 x subtotal)
Subtotal
B. Enter 25% of line A for Plan Review
Balance Due
$
What Do They Do at a Dot Physical - Includes specific guidelines for medical examiners on how to properly evaluate and certify an Oregon CDL driver’s health.
The completion of the application is simplified with resources available online, like those found at Illinois PDF Forms, which can assist both landlords and tenants in navigating the rental process efficiently.
Oregon Marine Board - The inclusion of a late fee serves as a reminder to submit applications promptly, maintaining compliance with state regulations.